This book is intended to help electric power and telephone company personnel and individuals interested in properly protecting critical tele communications circuits and equipment located in high voltage (HV) environments and to improve service reliability while maintaining safe working conditions. Critical telecommunications circuits are often located in HV environments such as electric utility power plants, substations, cell sites on power towers, and standalone telecommuni cations facilities such as 911 call centers and mountaintop telecom munications sites.
标签: Protection Voltage High
上传时间: 2020-05-27
上传用户:shancjb
Since the original publication of Manual 74 in 1991, and the preceding “Guidelines for Transmission Line Structural Loading” in 1984, the understanding of structural loadings on transmission line structures has broadened signifi cantly. However, improvements in computational capa- bility have enabled the transmission line engineer to more easily deter- mine structural loadings without properly understanding the parameters that affect these loads. Many seasoned professionals have expressed concern for the apparent lack of recent information on the topic of struc- tural loadings as new engineers enter this industry. The Committee on Electrical Transmission Structures is charged with the responsibility to report, evaluate, and provide loading requirements of transmission struc- tures. This task committee was therefore formed to update and revise the 1991 manual.
标签: Transmission Guidelines Electrical Line for
上传时间: 2020-06-07
上传用户:shancjb
电子书-RTL Design Style Guide for Verilog HDL540页A FF having a fixed input value is generated from the description in the upper portion of Example 2-21. In this case, ’0’ is output when the reset signal is asynchronously input, and ’1’ is output when the START signal rises. Therefore, the FF data input is fixed at the power supply, since the typical value ’1’ is output following the rise of the START signal. When FF input values are fixed, the fixed inputs become untestable and the fault detection rate drops. When implementing a scan design and converting to a scan FF, the scan may not be executed properl not be executed properly, so such descriptions , so such descriptions are not are not recommended. recommended.[1] As in the lower part of Example 2-21, be sure to construct a synchronous type of circuit and ensure that the clock signal is input to the clock pin of the FF. Other than the sample shown in Example 2-21, there are situations where for certain control signals, those that had been switched due to the conditions of an external input will no longer need to be switched, leaving only a FF. If logic exists in a lower level and a fixed value is input from an upper level, the input value of the FF may also end up being fixed as the result of optimization with logic synthesis tools. In a situation like this, while perhaps difficult to completely eliminate, the problem should be avoided as much as possible.
标签: RTL verilog hdl
上传时间: 2022-03-21
上传用户:canderile