📄 projassign.html.svn-base
字号:
<html>
<head>
<meta http-equiv="content-style-type" content="text/css">
<meta http-equiv="pragma" content="no-cache">
<title>Achievo-RMS Project Assignation Help</title>
<link href="../theme/help.css" rel="stylesheet" type="text/css">
</head>
<body bgcolor="#afffff">
<h1><a name="top"></a>Project Assignation</h1>
<form>
<b><a href="#General">General Description</a><br>
<a href="#Assign">Steps to Assign Resources to a Project</a><br>
<a href="#Modify">Steps to modify Resources in a Project</a><br>
<a href="#Tips">Tips</a></b><br><br>
<b><a name="General"></a>General Description</b><br><br>
This page is designed for the Company Directors and the System Administrator
to assign resources to a project and to modify existing resources status
in a project. <br>
<br>
To assign resources to a project or to modify existing resources in a project,
please select the project name from the drop-down Project Name list and
then press <input type="button" name="Display _Modify" value="Display & Modify">.<br><br>
<a href="#top"><img src="../images/top.gif" border="0" width="79" height="27"></a>
<br><br>
<b><a name="Assign"></a>Steps to Assign Resources to a Project</b>
<ol>
<li>Select a project which any resources should be assigned to and then press
<input type="button" name="Display _Modify" value="Display & Modify">.
<li>Go to "<b>Add Resources to Project</b>" to select how many resources should be assigned to this project
and then press <input type="button" name="Add" value="Add">.
<li>Select resources name from the drop down list provided and assign a project
role to each resources selected. To set From Date and End Date, please
focus on demanded date field and select a date from a popup calendar. Besides
resources selection, project role assignation and date settings, you <font color="#ff0000">must</font> set Billable flag and Charge type for each resources, and should also
fill in work Load percentage, Budget Days and Budget Amount accordingly
if applicable.
<li>After the complation of Step 3, please press <input type="button" name="Update" value="Update"> to save the assignation to the system.
<li>You can assign three resources to a project at a time. If more than three resources should be assigned to a project, repeat Step 1 - 4 in this section.
</ol>
<b><u><font color="red">IMPORTANT NOTICE</font></u></b>: <br><br>
You can't delete any assignation after you save that assignation to the
system. If you made a wrong entry, you could change End Date to the value
as the date of From Date and then update your change to the system.<br><br>
<a href="#Top"><img src="../images/Top.gif" border="0" width="79" height="27"></a>
<br><br>
<b><a name="Modify"></a>Steps to modify Existing Resources in a Project</b>
<ol>
<li>Select a project in which any resources should be modified and then press
<input type="button" name="Display _Modify" value="Display & Modify">.
<li>Modify any information if applicable and then press <input type="button" name="Update" value="Update"> to save your changes to the system.
</ol>
<a href="#top"><img src="../images/top.gif" border="0" width="79" height="27"></a>
<br><br>
<b><a name="Tips"></a>Tips</b>
<ol>
<li>The date for End Date must equal or be beyond the From Date.
</ol>
<a href="#top"><img src="../images/top.gif" border="0" width="79" height="27"></a>
<br>
</form>
</body>
</html>
⌨️ 快捷键说明
复制代码
Ctrl + C
搜索代码
Ctrl + F
全屏模式
F11
切换主题
Ctrl + Shift + D
显示快捷键
?
增大字号
Ctrl + =
减小字号
Ctrl + -