📄 sz.prg
字号:
Contingency CC82 in Base point (1)
Powerflow solved in 7 iterations
Contingency CC87 in Base point (1)
Powerflow solved in 5 iterations
Contingency A 4 in Base point (1)
Powerflow solved in 7 iterations
Contingency A 8 in Base point (1)
Powerflow solved in 7 iterations
Contingency A 19 in Base point (1)
Powerflow solved in 6 iterations
Contingency A 20 in Base point (1)
Powerflow solved in 5 iterations
Stressed Base point (1)
Powerflow solved in 6 iterations
Contingency CC41 in Stressed Base point (1)
Powerflow solved in 7 iterations
Contingency CC42 in Stressed Base point (1)
Powerflow solved in 8 iterations
Contingency CC81 in Stressed Base point (1)
Powerflow solved in 7 iterations
Contingency CC82 in Stressed Base point (1)
Powerflow solved in 7 iterations
Contingency CC87 in Stressed Base point (1)
Powerflow solved in 6 iterations
Contingency A 4 in Stressed Base point (1)
Powerflow solved in 8 iterations
Contingency A 8 in Stressed Base point (1)
Powerflow solved in 7 iterations
Contingency A 19 in Stressed Base point (1)
Powerflow solved in 6 iterations
Contingency A 20 in Stressed Base point (1)
Powerflow solved in 6 iterations
Point no. 2
E+N GEN : 6450.0 MW A5 GEN : 78159.8 MW
Powerflow solved in 4 iterations
Contingency CC41 in Point no. 2
Powerflow solved in 7 iterations
Contingency CC42 in Point no. 2
Powerflow solved in 7 iterations
Contingency CC81 in Point no. 2
Powerflow solved in 7 iterations
Contingency CC82 in Point no. 2
Powerflow solved in 7 iterations
Contingency CC87 in Point no. 2
Powerflow solved in 6 iterations
Contingency A 4 in Point no. 2
Powerflow solved in 7 iterations
Contingency A 8 in Point no. 2
Powerflow solved in 7 iterations
Contingency A 19 in Point no. 2
Powerflow solved in 5 iterations
Contingency A 20 in Point no. 2
Powerflow solved in 6 iterations
Stressed Point no. 2
Powerflow solved in 6 iterations
Contingency CC41 in Stressed Point no. 2
Powerflow solved in 7 iterations
Contingency CC42 in Stressed Point no. 2
Powerflow solved in 8 iterations
Contingency CC81 in Stressed Point no. 2
Powerflow solved in 7 iterations
Contingency CC82 in Stressed Point no. 2
Powerflow solved in 8 iterations
Contingency CC87 in Stressed Point no. 2
Powerflow solved in 6 iterations
Contingency A 4 in Stressed Point no. 2
Powerflow solved in 8 iterations
Contingency A 8 in Stressed Point no. 2
Powerflow solved in 8 iterations
Contingency A 19 in Stressed Point no. 2
Powerflow solved in 6 iterations
Contingency A 20 in Stressed Point no. 2
Powerflow solved in 6 iterations
Point no. 3
E+N GEN : 6550.0 MW A5 GEN : 78059.8 MW
Powerflow solved in 4 iterations
Contingency CC41 in Point no. 3
Powerflow solved in 7 iterations
Contingency CC42 in Point no. 3
Powerflow solved in 7 iterations
Contingency CC81 in Point no. 3
Powerflow solved in 7 iterations
Contingency CC82 in Point no. 3
Powerflow solved in 7 iterations
Contingency CC87 in Point no. 3
Powerflow solved in 6 iterations
Contingency A 4 in Point no. 3
Powerflow solved in 7 iterations
Contingency A 8 in Point no. 3
Powerflow solved in 7 iterations
Contingency A 19 in Point no. 3
Powerflow solved in 6 iterations
Contingency A 20 in Point no. 3
Powerflow solved in 6 iterations
Stressed Point no. 3
Powerflow solved in 6 iterations
Contingency CC41 in Stressed Point no. 3
Powerflow solved in 7 iterations
Contingency CC42 in Stressed Point no. 3
Powerflow solved in 8 iterations
Contingency CC81 in Stressed Point no. 3
Powerflow solved in 7 iterations
Contingency CC82 in Stressed Point no. 3
Powerflow solved in 8 iterations
Contingency CC87 in Stressed Point no. 3
Powerflow solved in 6 iterations
Contingency A 4 in Stressed Point no. 3
Powerflow solved in 8 iterations
Contingency A 8 in Stressed Point no. 3
Powerflow solved in 8 iterations
Contingency A 19 in Stressed Point no. 3
Powerflow solved in 6 iterations
Contingency A 20 in Stressed Point no. 3
Powerflow solved in 6 iterations
Point no. 4
E+N GEN : 6650.0 MW A5 GEN : 77959.8 MW
Powerflow solved in 4 iterations
Contingency CC41 in Point no. 4
Powerflow solved in 7 iterations
Contingency CC42 in Point no. 4
Powerflow solved in 7 iterations
Contingency CC81 in Point no. 4
Powerflow solved in 7 iterations
Contingency CC82 in Point no. 4
Powerflow solved in 7 iterations
Contingency CC87 in Point no. 4
Powerflow solved in 6 iterations
Contingency A 4 in Point no. 4
Powerflow solved in 7 iterations
Contingency A 8 in Point no. 4
Powerflow solved in 7 iterations
Contingency A 19 in Point no. 4
Powerflow solved in 6 iterations
Contingency A 20 in Point no. 4
Powerflow solved in 6 iterations
Stressed Point no. 4
Powerflow solved in 6 iterations
Contingency CC41 in Stressed Point no. 4
Powerflow solved in 7 iterations
Contingency CC42 in Stressed Point no. 4
Powerflow solved in 8 iterations
Contingency CC81 in Stressed Point no. 4
Powerflow solved in 8 iterations
Contingency CC82 in Stressed Point no. 4
Powerflow solved in 8 iterations
Contingency CC87 in Stressed Point no. 4
Powerflow solved in 6 iterations
Contingency A 4 in Stressed Point no. 4
Powerflow solved in 8 iterations
Contingency A 8 in Stressed Point no. 4
Powerflow solved in 8 iterations
Contingency A 19 in Stressed Point no. 4
Powerflow solved in 6 iterations
Contingency A 20 in Stressed Point no. 4
Powerflow solved in 6 iterations
Point no. 5
E+N GEN : 6750.0 MW A5 GEN : 77859.8 MW
Powerflow solved in 6 iterations
Contingency CC41 in Point no. 5
Powerflow solved in 7 iterations
Contingency CC42 in Point no. 5
Powerflow solved in 7 iterations
Contingency CC81 in Point no. 5
Powerflow solved in 7 iterations
Contingency CC82 in Point no. 5
Powerflow solved in 7 iterations
Contingency CC87 in Point no. 5
Powerflow solved in 6 iterations
Contingency A 4 in Point no. 5
Powerflow solved in 7 iterations
Contingency A 8 in Point no. 5
Powerflow solved in 7 iterations
Contingency A 19 in Point no. 5
Powerflow solved in 6 iterations
Contingency A 20 in Point no. 5
Powerflow solved in 6 iterations
Stressed Point no. 5
Powerflow solved in 6 iterations
Contingency CC41 in Stressed Point no. 5
Powerflow solved in 7 iterations
Contingency CC42 in Stressed Point no. 5
Powerflow solved in 8 iterations
Contingency CC81 in Stressed Point no. 5
Powerflow solved in 8 iterations
Contingency CC82 in Stressed Point no. 5
Powerflow solved in 8 iterations
Contingency CC87 in Stressed Point no. 5
Powerflow solved in 6 iterations
Contingency A 4 in Stressed Point no. 5
Powerflow solved in 8 iterations
Contingency A 8 in Stressed Point no. 5
Powerflow solved in 8 iterations
Contingency A 19 in Stressed Point no. 5
Powerflow solved in 6 iterations
Contingency A 20 in Stressed Point no. 5
Powerflow solved in 6 iterations
Point no. 6
E+N GEN : 6850.0 MW A5 GEN : 77759.8 MW
Powerflow solved in 6 iterations
Contingency CC41 in Point no. 6
Powerflow solved in 7 iterations
Contingency CC42 in Point no. 6
Powerflow solved in 7 iterations
Contingency CC81 in Point no. 6
Powerflow solved in 7 iterations
Contingency CC82 in Point no. 6
Powerflow solved in 7 iterations
Contingency CC87 in Point no. 6
Powerflow solved in 6 iterations
Contingency A 4 in Point no. 6
Powerflow solved in 7 iterations
Contingency A 8 in Point no. 6
Powerflow solved in 7 iterations
Contingency A 19 in Point no. 6
Powerflow solved in 6 iterations
Contingency A 20 in Point no. 6
Powerflow solved in 6 iterations
Stressed Point no. 6
Powerflow solved in 6 iterations
Contingency CC41 in Stressed Point no. 6
Powerflow solved in 8 iterations
Contingency CC42 in Stressed Point no. 6
Powerflow solved in 8 iterations
Contingency CC81 in Stressed Point no. 6
Powerflow solved in 8 iterations
Contingency CC82 in Stressed Point no. 6
Powerflow solved in 8 iterations
Contingency CC87 in Stressed Point no. 6
Powerflow solved in 6 iterations
Contingency A 4 in Stressed Point no. 6
Powerflow solved in 8 iterations
Contingency A 8 in Stressed Point no. 6
Powerflow solved in 8 iterations
Contingency A 19 in Stressed Point no. 6
Powerflow solved in 6 iterations
Contingency A 20 in Stressed Point no. 6
Powerflow solved in 6 iterations
Point no. 7
E+N GEN : 6950.0 MW A5 GEN : 77659.8 MW
Powerflow solved in 4 iterations
Contingency CC41 in Point no. 7
Powerflow solved in 7 iterations
Contingency CC42 in Point no. 7
Powerflow solved in 8 iterations
Contingency CC81 in Point no. 7
Powerflow solved in 7 iterations
Contingency CC82 in Point no. 7
Powerflow solved in 7 iterations
Contingency CC87 in Point no. 7
Powerflow solved in 6 iterations
Contingency A 4 in Point no. 7
Powerflow solved in 8 iterations
Contingency A 8 in Point no. 7
Powerflow solved in 7 iterations
Contingency A 19 in Point no. 7
Powerflow solved in 6 iterations
Contingency A 20 in Point no. 7
Powerflow solved in 6 iterations
Stressed Point no. 7
Powerflow solved in 6 iterations