c954a01.a

来自「linux下编程用 编译软件」· A 代码 · 共 263 行

A
263
字号
-- C954A01.A----                             Grant of Unlimited Rights----     Under contracts F33600-87-D-0337, F33600-84-D-0280, MDA903-79-C-0687,--     F08630-91-C-0015, and DCA100-97-D-0025, the U.S. Government obtained --     unlimited rights in the software and documentation contained herein.--     Unlimited rights are defined in DFAR 252.227-7013(a)(19).  By making --     this public release, the Government intends to confer upon all --     recipients unlimited rights  equal to those held by the Government.  --     These rights include rights to use, duplicate, release or disclose the --     released technical data and computer software in whole or in part, in --     any manner and for any purpose whatsoever, and to have or permit others --     to do so.----                                    DISCLAIMER----     ALL MATERIALS OR INFORMATION HEREIN RELEASED, MADE AVAILABLE OR--     DISCLOSED ARE AS IS.  THE GOVERNMENT MAKES NO EXPRESS OR IMPLIED --     WARRANTY AS TO ANY MATTER WHATSOEVER, INCLUDING THE CONDITIONS OF THE--     SOFTWARE, DOCUMENTATION OR OTHER INFORMATION RELEASED, MADE AVAILABLE --     OR DISCLOSED, OR THE OWNERSHIP, MERCHANTABILITY, OR FITNESS FOR A--     PARTICULAR PURPOSE OF SAID MATERIAL.--*---- OBJECTIVE:--      Check that if a task requeued without abort on a protected entry queue--      is aborted, the abort is deferred until the entry call completes,--      after which the task becomes completed.---- TEST DESCRIPTION:--      Declare a protected type which simulates a printer device driver--      (foundation code).----      Declare a task which simulates a printer server for multiple printers.----      For the protected type, declare an entry with a barrier that is set--      false by a protected procedure (which simulates starting a print job--      on the printer), and is set true by a second protected procedure (which--      simulates a handler called when the printer interrupts, indicating--      that printing is done).----      For the task, declare an entry whose corresponding accept statement--      contains a call to first protected procedure of the protected type--      (which sets the barrier of the protected entry to false), followed by--      a requeue with abort to the protected entry. Declare a second entry--      which does nothing.----      Declare a "requesting" task which calls the printer server task entry--      (and thus executes the requeue). Attempt to abort the requesting--      task. Verify that it is not aborted. Call the second protected--      procedure of the protected type (the interrupt handler) and verify that--      the protected entry completes for the requesting task. Verify that--      the requesting task is then aborted.---- TEST FILES:--      This test depends on the following foundation code:----         F954A00.A------ CHANGE HISTORY:--      06 Dec 94   SAIC    ACVC 2.0--      10 Oct 96   SAIC    Added pragma elaborate.----!package C954A01_0 is  -- Printer server abstraction.   -- Simulate a system with multiple printers. The entry Print requests   -- that data be printed on the next available printer. The entry call   -- is accepted when a printer is available, and completes when printing   -- is done.   task Printer_Server is      entry Print (File_Name : String);        -- Test the requeue statement.      entry Verify_Results;                    -- Artifice for test purposes.   end Printer_Server;end C954A01_0;     --==================================================================--with Report;with ImpDef;with F954A00;              -- Printer device abstraction.use  F954A00;pragma Elaborate(F954A00);package body C954A01_0 is  -- Printer server abstraction.   task body Printer_Server is      Printers_Busy  : Boolean    := True;      Index          : Printer_ID := 1;      Print_Accepted : Boolean    := False;   begin      loop         -- Wait for a printer to become available:         while Printers_Busy loop            Printers_Busy := False;                        -- Exit loop if                                                           -- entry accepted.            select               Printer(Index).Done_Printing;               -- Accepted immed.                                                           -- when printer is                                                           -- available.            else               Index := 1 + (Index mod Number_Of_Printers);-- Entry not immed.               Printers_Busy := True;                      -- accepted; keep            end select;                                    -- looping.         end loop;                                                           -- Value of Index                                                           -- at loop exit                                                           -- identifies the                                                           -- avail. printer.         -- Wait for a print request or terminate:         select            accept Print (File_Name : String) do               Print_Accepted := True;                     -- Allow                                                           -- Verify_Results                                                           -- to be accepted.               Printer(Index).Start_Printing (File_Name);  -- Begin printing on                                                           -- the available               --                        --                -- printer.               -- Requeue is tested here --               --                        --                                                           -- Requeue caller so               requeue Printer(Index).Done_Printing;       -- server task free                                                           -- to accept other            end Print;                                     -- requests.         or            --  Guard ensures that Verify_Results cannot be accepted            --  until after Print has been accepted. This avoids a            --  race condition in the main program.            when Print_Accepted => accept Verify_Results;  -- Artifice for                                                           -- testing purposes.         or            terminate;         end select;         -- Allow other tasks to get control         delay ImpDef.Minimum_Task_Switch;      end loop;   exception      when others =>         Report.Failed ("Exception raised in Printer_Server task");   end Printer_Server;end C954A01_0;     --==================================================================--with Report;with ImpDef;with F954A00;    -- Printer device abstraction.with C954A01_0;  -- Printer server abstraction.use  C954A01_0;use  F954A00;procedure C954A01 is   Long_Enough : constant Duration := ImpDef.Switch_To_New_Task;               --==============================================--   task Print_Request;                       -- Send a print request.   task body Print_Request is      My_File : constant String := "MYFILE.DAT";   begin      Printer_Server.Print (My_File);          -- Invoke requeue statement.      Report.Failed ("Task continued execution following entry call");   exception      when others =>         Report.Failed ("Exception raised in Print_Request task");   end Print_Request;               --==============================================--begin  -- Main program.   Report.Test ("C954A01", "Requeue without abort - check that the abort " &            "is deferred until after the rendezvous completes. (Task to PO)");   --  To pass this test, the following must be true:   --    --     (A) The abort of Print_Request is deferred until after the   --         Done_Printing entry body completes.   --     (B) Print_Request aborts after the Done_Printing entry call   --         completes.   --    --  Call the entry Verify_Results. The entry call will not be accepted   --  until after Print_Request has been requeued to Done_Printing.   Printer_Server.Verify_Results;           -- Accepted after Print_Request is                                            -- requeued to Done_Printing.   -- Simulate an application which needs access to the printer within   -- a specified time, and which aborts the current printer job if time   -- runs out.   select      Printer(1).Done_Printing;             -- Wait for printer to come free.   or      delay Long_Enough;                    -- Print job took too long.      abort Print_Request;                  -- Abort print job.   end select;   Printer_Server.Verify_Results;           -- Abortion completion point: force                                            -- abort to complete (if it's going                                            -- to).   --  Verify that the Done_Printing entry body has not yet completed,   --  and thus that Print_Request has not been aborted.   if Printer(1).Is_Done then      Report.Failed ("Target entry of requeue executed prematurely");   elsif Print_Request'Terminated then      Report.Failed ("Caller was aborted before entry was complete");   else      Printer(1).Handle_Interrupt;          -- Simulate a printer interrupt,                                            -- signaling that printing is                                            -- done.      --  The Done_Printing entry body will complete before the next protected      --  action is called (Printer(1).Is_Done). Verify (A) and (B): that the      --  Print_Request is aborted.      Printer_Server.Verify_Results;        -- Abortion completion point: force                                            -- Print_Request abort to complete.      if not Printer(1).Is_Done then         Report.Failed ("Target entry of requeue did not complete");      end if;      if not Print_Request'Terminated then         Report.Failed ("Task not aborted following completion of entry call");         abort Print_Request;               -- Try to kill hung task.      end if;   end if;   Report.Result;end C954A01;

⌨️ 快捷键说明

复制代码Ctrl + C
搜索代码Ctrl + F
全屏模式F11
增大字号Ctrl + =
减小字号Ctrl + -
显示快捷键?