📄 draft-bidulock-sigtran-m2pa-test-00.me
字号:
.R1# abbreviate A# label Lno-default-databaseno-accumulatedatabase ../idrefsannotate X ppmove-punctuationdiscard YZ.R2.de $0.(x 0\\$2 \\$1.)x...if '\*(.T'ascii' \{\.fo 'B. Bidulock'Version 0.0'FORMFEED[Page %]'.m1 1 \" top margin above header.m2 1 \" top margin below header.m3 1 \" btm margin above footer.m4 0 \" btm margin below footer.pl 11.0i.ll 7.2i.lt 7.2i.nr LL 7.2i.nr LT 7.2i.ad l.hy 0.ta 3.ba 0.po 0.nr so 0.nr ii 6n.nr pi 4n.nr po 3n.nr bs 0.nr bi 2n.\}.if '\*(.T'ps' \{\.fo 'B. Bidulock'Version 0.0'Page %'.m1 0.25i \" top margin above header.m2 0.25i \" top margin below header.m3 0.25i \" btm margin above footer.m4 0.25i \" btm margin below footer.pl 11.0i.ll 7.2i.lt 7.2i.nr LL 7.2i.nr LT 7.2i.ad b.hy 6.ta 3.ba 0.po 0.75i.nr so 0.nr ii 0.5i.nr pi 0.5i.nr po 0.25i.nr bs 0.nr bi 0.25i.nr hi 0.5i.\}.he 'Internet Draft'M2PA-TEST'December 2001'.bp.(b C\fCNetwork Working Group Brian Bidulock\fCINTERNET-DRAFT OpenSS7 Corporation\fCExpires in six months December 2001\fR\fBSS7 MTP2-User Peer-to-Peer Adaptation Layer\fR\fBTest Specifications\fR\fBM2PA-TEST\fR\fB<draft-bidulock-sigtran-m2pa-test-00.txt>.)b.ne 4.uh "Status of this Memo".lpThis document is an Internet-Draft and is in full conformance with allprovisions of Section 10 or RFC 2026. Internet-Drafts are working documentsof the Internet Engineering Task Force (IETF), its areas, and its workinggroups. Note that other groups may also distribute working documents asInternet-Drafts..lpInternet-Drafts are draft documents valid for a maximum of six months and maybe updated, replaced, or obsoleted by other documents at any time. It isinappropriate to use Internet-Drafts as reference material or to cite themother than as 'work in progress'..lpThe list of current Internet-Drafts can be accessed athttp://www.ietf.org/ietf/1id-abstracts.txt.lpThe list of Internet-Draft Shadow Directories can be accessed athttp://www.ietf.org/shadow.html.lpTo learn the current status of any Internet-Draft, please check the'1id-abstracts.txt' listing contained in the Internet-Drafts ShadowDirectories on ftp.is.co.za (Africa), nic.nordu.net (Europe), munnari.oz.au(Pacific Rim), ftp.ietf.org (US East Coast), or ftp.isi.edu (US West Coast)..uh "Abstract".lpThis Internet Draft provides information for the Internet community on testcases for testing the SS7 M2P2-User Peer-to-Peer Adaptation Layer.[m2pa03.]based on the conformance test specifications for SS7 MTP Level 2..[q781.].sh 1 "Introduction".lpThis draft provides a set of detailed test of the SS7 MTP2-User Peer-to-PeerAdaptation Layer.[m2pa03.]based on the test specifications for SS7 MTP Level 2..[q781.]These tests are intended to validate the SS7 MTP2-User Peer-to-Peer AdaptationLayer (M2PA) protocol..[m2pa03.]The tests are broken into \fIValidation\fR (VAT) tests and \fIValidation\fR(VAT) and \fICompatibility\fR (CPT) tests.These tests attempt to completely validate the M2PA protocol withoutredundancy. Each test is described as simply as possible to check preciselythe elementary function of the protocol. The tests are listed in no specificorder..sh 1 "Test Environment".sh 2 "Test Configurations".lpA single M2PA link is used in the tests. \fIFigure \n($1.\n($2(a)\fR and \fIFigure\n($1.\n($2-2\fR show a single link between IUT and PT. In \fITest Configuration1\fR as shown in \fIFigure \n($1.\n($2(a)\fR, PT initiates the association. In\fITest Configuration 2\fR as shown in \fIFigure \n($1.\n($2-2\fR, IUT initiatesthe association. Test specifications in both configurations are written totest the M2PA at IUT ..(b C\fC ________ Link 1 ________\ | | SCTP Association | || PT |-------------------------->| IUT ||________| |________|NOTE: PT initiates the association\fIFigure \n($1.\n($2(a).\fR Test Configuration 1..(x 1\fIFigure \n($1.\n($2(a).\fR Test Configuration 1..)x.)b.(b C\fC ________ Link 1 ________\ | | SCTP Association | || PT |<--------------------------| IUT ||________| |________|NOTE: IUT initiates the association\fIFigure \n($1.\n($2(b).\fR Test Configuration 2..(x 1\fIFigure \n($1.\n($2(b).\fR Test Configuration 2..)x.)b.sh 2 "Recommended IUT Settings".sh 3 "Timer Values".lpIt is recommended that the following timer values be configured at the IUT forthe purposes of performing these validation tests:.(b I F.ip "T1"45 seconds.ip "T2"5 seconds.ip "T2l"20 seconds(not applicable).ip "T2h"100 seconds(not applicable).ip "T3"1 second.ip "T4n"8 seconds.ip "T4e"0.5 seconds.ip "T5"0.1 seconds(not applicable).ip "T6"4 seconds.ip "T7"1 second.ip "T8"0.1 seconds(not applicable).)b.sh 3 "Buffer Threshold Values".lpIt is recommended that the following buffer threshold values be configured atthe IUT for the purpose of performing these validation tests:.(b I F.ip "N1"???.ip "N2"127 messages.)b.bp.sh 1 "Tests".sh 2 "Link State Control - Expected signal units/orders".sh 3 "Initialization (Power-up)".lpThese tests check that the IUT enters the correct state upon establishment ofthe SCTP association. Establishing the association at both peers is theequivalent to the Q.703 "Power On". The correct behavior is for both M2PApeers to send a status "Out of Service" and enter the "Out of Service" state.These test are useful both for Validation and Compatibility testing..sh 4 "Forward Direction".lpThe test is performed in the forward direction.The expected sequence of events is illustrated \fIFigure \n($1.\n($2.\n($3(a)\fR..(b CReference: Q.781/Test 1.1\fC ___________________________________________________________________\ | || PT IUT || || :power on || OUT-OF-SERVICE -----------------> || :power on || <----------------- OUT-OF-SERVICE || ||___________________________________________________________________|.ce 1\fIFigure \n($1.\n($2.\n($3(a).\fR Initialization (Power-up).(x 1\fIFigure \n($1.\n($2.\n($3(a).\fR Initialization (Power-up).)x.)b.ip "Test Description:".npThe test begins with both the PT and the IUT in the "Power Off" state..npThe "Power On" command is issued at the PT and then the IUT..npCheck that the IUT sends a status "Out of Service" message enters and remainsin the "Out of Service" state..npRepeat the test in the opposite direction as shown below..bp.sh 4 "Reverse Direction".lpThis is the test repeated in the opposite direction.The expected sequence of events is illustrated \fIFigure \n($1.\n($2.\n($3(b)\fR..(b CReference: Q.781/Test 1.1\fC ___________________________________________________________________\ | || PT IUT || || :power on || <----------------- OUT-OF-SERVICE || :power on || OUT-OF-SERVICE -----------------> || ||___________________________________________________________________|.ce 1\fIFigure \n($1.\n($2.\n($3(b).\fR Initialization (Power-up).(x 1\fIFigure \n($1.\n($2.\n($3(b).\fR Initialization (Power-up).)x.)b.ip "Test Description:" 12.npThe test begins with both the PT and the IUT in the "Power Off" state..npThe "Power On" command is issued at the IUT and then the PT..npCheck that the IUT sends a status "Out of Service" message enters and remainsin the "Out of Service" state..bp.sh 3 "Timer T2".lpThis test validates the T2 (Not Aligned) timer and procedure at the IUT. This
⌨️ 快捷键说明
复制代码
Ctrl + C
搜索代码
Ctrl + F
全屏模式
F11
切换主题
Ctrl + Shift + D
显示快捷键
?
增大字号
Ctrl + =
减小字号
Ctrl + -