rfc2026.txt
来自「RFC 的详细文档!」· 文本 代码 · 共 1,448 行 · 第 1/5 页
TXT
1,448 行
5. BEST CURRENT PRACTICE (BCP) RFCs
The BCP subseries of the RFC series is designed to be a way to
standardize practices and the results of community deliberations. A
BCP document is subject to the same basic set of procedures as
standards track documents and thus is a vehicle by which the IETF
community can define and ratify the community's best current thinking
on a statement of principle or on what is believed to be the best way
to perform some operations or IETF process function.
Historically Internet standards have generally been concerned with
the technical specifications for hardware and software required for
computer communication across interconnected networks. However,
since the Internet itself is composed of networks operated by a great
variety of organizations, with diverse goals and rules, good user
service requires that the operators and administrators of the
Internet follow some common guidelines for policies and operations.
While these guidelines are generally different in scope and style
from protocol standards, their establishment needs a similar process
for consensus building.
While it is recognized that entities such as the IAB and IESG are
composed of individuals who may participate, as individuals, in the
technical work of the IETF, it is also recognized that the entities
Bradner Best Current Practice [Page 16]
RFC 2026 Internet Standards Process October 1996
themselves have an existence as leaders in the community. As leaders
in the Internet technical community, these entities should have an
outlet to propose ideas to stimulate work in a particular area, to
raise the community's sensitivity to a certain issue, to make a
statement of architectural principle, or to communicate their
thoughts on other matters. The BCP subseries creates a smoothly
structured way for these management entities to insert proposals into
the consensus-building machinery of the IETF while gauging the
community's view of that issue.
Finally, the BCP series may be used to document the operation of the
IETF itself. For example, this document defines the IETF Standards
Process and is published as a BCP.
5.1 BCP Review Process
Unlike standards-track documents, the mechanisms described in BCPs
are not well suited to the phased roll-in nature of the three stage
standards track and instead generally only make sense for full and
immediate instantiation.
The BCP process is similar to that for proposed standards. The BCP
is submitted to the IESG for review, (see section 6.1.1) and the
existing review process applies, including a Last-Call on the IETF
Announce mailing list. However, once the IESG has approved the
document, the process ends and the document is published. The
resulting document is viewed as having the technical approval of the
IETF.
Specifically, a document to be considered for the status of BCP must
undergo the procedures outlined in sections 6.1, and 6.4 of this
document. The BCP process may be appealed according to the procedures
in section 6.5.
Because BCPs are meant to express community consensus but are arrived
at more quickly than standards, BCPs require particular care.
Specifically, BCPs should not be viewed simply as stronger
Informational RFCs, but rather should be viewed as documents suitable
for a content different from Informational RFCs.
A specification, or group of specifications, that has, or have been
approved as a BCP is assigned a number in the BCP series while
retaining its RFC number(s).
Bradner Best Current Practice [Page 17]
RFC 2026 Internet Standards Process October 1996
6. THE INTERNET STANDARDS PROCESS
The mechanics of the Internet Standards Process involve decisions of
the IESG concerning the elevation of a specification onto the
standards track or the movement of a standards-track specification
from one maturity level to another. Although a number of reasonably
objective criteria (described below and in section 4) are available
to guide the IESG in making a decision to move a specification onto,
along, or off the standards track, there is no algorithmic guarantee
of elevation to or progression along the standards track for any
specification. The experienced collective judgment of the IESG
concerning the technical quality of a specification proposed for
elevation to or advancement in the standards track is an essential
component of the decision-making process.
6.1 Standards Actions
A "standards action" -- entering a particular specification into,
advancing it within, or removing it from, the standards track -- must
be approved by the IESG.
6.1.1 Initiation of Action
A specification that is intended to enter or advance in the Internet
standards track shall first be posted as an Internet-Draft (see
section 2.2) unless it has not changed since publication as an RFC.
It shall remain as an Internet-Draft for a period of time, not less
than two weeks, that permits useful community review, after which a
recommendation for action may be initiated.
A standards action is initiated by a recommendation by the IETF
Working group responsible for a specification to its Area Director,
copied to the IETF Secretariat or, in the case of a specification not
associated with a Working Group, a recommendation by an individual to
the IESG.
6.1.2 IESG Review and Approval
The IESG shall determine whether or not a specification submitted to
it according to section 6.1.1 satisfies the applicable criteria for
the recommended action (see sections 4.1 and 4.2), and shall in
addition determine whether or not the technical quality and clarity
of the specification is consistent with that expected for the
maturity level to which the specification is recommended.
In order to obtain all of the information necessary to make these
determinations, particularly when the specification is considered by
the IESG to be extremely important in terms of its potential impact
Bradner Best Current Practice [Page 18]
RFC 2026 Internet Standards Process October 1996
on the Internet or on the suite of Internet protocols, the IESG may,
at its discretion, commission an independent technical review of the
specification.
The IESG will send notice to the IETF of the pending IESG
consideration of the document(s) to permit a final review by the
general Internet community. This "Last-Call" notification shall be
via electronic mail to the IETF Announce mailing list. Comments on a
Last-Call shall be accepted from anyone, and should be sent as
directed in the Last-Call announcement.
The Last-Call period shall be no shorter than two weeks except in
those cases where the proposed standards action was not initiated by
an IETF Working Group, in which case the Last-Call period shall be no
shorter than four weeks. If the IESG believes that the community
interest would be served by allowing more time for comment, it may
decide on a longer Last-Call period or to explicitly lengthen a
current Last-Call period.
The IESG is not bound by the action recommended when the
specification was submitted. For example, the IESG may decide to
consider the specification for publication in a different category
than that requested. If the IESG determines this before the Last-
Call is issued then the Last-Call should reflect the IESG's view.
The IESG could also decide to change the publication category based
on the response to a Last-Call. If this decision would result in a
specification being published at a "higher" level than the original
Last-Call was for, a new Last-Call should be issued indicating the
IESG recommendation. In addition, the IESG may decide to recommend
the formation of a new Working Group in the case of significant
controversy in response to a Last-Call for specification not
originating from an IETF Working Group.
In a timely fashion after the expiration of the Last-Call period, the
IESG shall make its final determination of whether or not to approve
the standards action, and shall notify the IETF of its decision via
electronic mail to the IETF Announce mailing list.
6.1.3 Publication
If a standards action is approved, notification is sent to the RFC
Editor and copied to the IETF with instructions to publish the
specification as an RFC. The specification shall at that point be
removed from the Internet-Drafts directory.
Bradner Best Current Practice [Page 19]
RFC 2026 Internet Standards Process October 1996
An official summary of standards actions completed and pending shall
appear in each issue of the Internet Society's newsletter. This
shall constitute the "publication of record" for Internet standards
actions.
The RFC Editor shall publish periodically an "Internet Official
Protocol Standards" RFC [1], summarizing the status of all Internet
protocol and service specifications.
6.2 Advancing in the Standards Track
The procedure described in section 6.1 is followed for each action
that attends the advancement of a specification along the standards
track.
A specification shall remain at the Proposed Standard level for at
least six (6) months.
A specification shall remain at the Draft Standard level for at least
four (4) months, or until at least one IETF meeting has occurred,
whichever comes later.
These minimum periods are intended to ensure adequate opportunity for
community review without severely impacting timeliness. These
intervals shall be measured from the date of publication of the
corresponding RFC(s), or, if the action does not result in RFC
publication, the date of the announcement of the IESG approval of the
action.
A specification may be (indeed, is likely to be) revised as it
advances through the standards track. At each stage, the IESG shall
determine the scope and significance of the revision to the
specification, and, if necessary and appropriate, modify the
recommended action. Minor revisions are expected, but a significant
revision may require that the specification accumulate more
experience at its current maturity level before progressing. Finally,
if the specification has been changed very significantly, the IESG
may recommend that the revision be treated as a new document, re-
entering the standards track at the beginning.
Change of status shall result in republication of the specification
as an RFC, except in the rare case that there have been no changes at
all in the specification since the last publication. Generally,
desired changes will be "batched" for incorporation at the next level
in the standards track. However, deferral of changes to the next
standards action on the specification will not always be possible or
desirable; for example, an important typographical error, or a
technical error that does not represent a change in overall function
Bradner Best Current Practice [Page 20]
RFC 2026 Internet Standards Process October 1996
of the specification, may need to be corrected immediately. In such
cases, the IESG or RFC Editor may be asked to republish the RFC (with
a new number) with corrections, and this will not reset the minimum
time-at-level clock.
When a standards-track specification has not reached the Internet
Standard level but has remained at the same maturity level for
twenty-four (24) months, and every twelve (12) months thereafter
until the status is changed, the IESG shall review the viability of
the standardization effort responsible for that specification and the
usefulness of the technology. Following each such review, the IESG
shall approve termination or continuation of the development effort,
at the same time the IESG shall decide to maintain the specification
at the same maturity level or to move it to Historic status. This
decision shall be communicated to the IETF by electronic mail to the
IETF Announce mailing list to allow the Internet community an
opportunity to comment. This provision is not intended to threaten a
legitimate and active Working Group effort, but rather to provide an
administrative mechanism for terminating a moribund effort.
6.3 Revising a Standard
A new version of an established Internet Standard must progress
through the full Internet standardization process as if it were a
completely new specification. Once the new version has reached the
Standard level, it will usually replace the previous version, which
will be moved to Historic status. However, in some cases both
versions may remain as Internet Standards to honor the requirements
of an installed base. In this situation, the relationship between
the previous and the new versions must be explicitly stated in the
text of the new version or in another appropriate document (e.g., an
Applicability Statement; see section 3.2).
6.4 Retiring a Standard
⌨️ 快捷键说明
复制代码Ctrl + C
搜索代码Ctrl + F
全屏模式F11
增大字号Ctrl + =
减小字号Ctrl + -
显示快捷键?